{
  "schemaVersion": 1,
  "kind": "workbook",
  "key": "nrel-crest-anaerobic-digestion/v1.4",
  "title": "NREL CREST Anaerobic Digestion Cash-Flow Model",
  "summary": "CREST v1.4 anaerobic digestion required tariff, nominal LCOE, project finance and after-tax equity return calculator.",
  "edition": "v1.4",
  "html": "https://formualizer.com/catalog/nrel-crest-anaerobic-digestion",
  "parent": {
    "text": "https://formualizer.com/catalog/subjects/energy/llms.txt",
    "json": "https://formualizer.com/catalog/subjects/energy/llms.json"
  },
  "publisher": "National Renewable Energy Laboratory (NREL / DOE)",
  "publisherPageUrl": "https://www.nlr.gov/analysis/crest",
  "verificationLevel": "scenario-engine-regression",
  "verificationExplanation": "Scenarios match the engine’s own earlier results, not an independent check.",
  "rightsExplanation": "This is an academic source; this catalog class does not establish a redistribution licence.",
  "limitations": [
    "Three native What-If tables are recalculated at all 33 trial tariffs; midpoint rounding preserves 0.1-cent bracket resolution. Supported source tariff interval 0..100 cents/kWh.",
    "Complex year schedules can be edited with cellOverrides. Source edition metadata follows the supplied v1.4 catalog edition; source workbook does not establish current-law suitability.",
    "Source-grid What-If solver; baseline cached-value comparison and perturbed regression vectors."
  ],
  "releaseBlockers": [],
  "licenseClass": "open-academic",
  "disclaimer": "Catalog calculations, not certification.",
  "removal": "Entries are removed on the publisher’s request.",
  "flows": [
    {
      "id": "quick_biogas_lcoe_check",
      "title": "Quick anaerobic digestion LCOE check",
      "description": "Primary operating, capital, financing and revenue assumptions; omitted assumptions retain source defaults. Simple capex/O&M switches activate corresponding scalar costs. All percentages are decimal fractions.",
      "inputPorts": [
        "system_size_kw",
        "electrical_efficiency",
        "availability",
        "parasitic_load",
        "capital_cost_detail",
        "installed_cost_per_kw",
        "om_cost_detail",
        "fixed_om_per_kw_year",
        "variable_om_cents_per_kwh",
        "feedstock_cost_per_ton",
        "tipping_fee_per_ton",
        "tipping_quantity_tons_year",
        "debt_fraction",
        "debt_interest_rate"
      ],
      "outputPorts": [
        "year_one_coe_cents_per_kwh",
        "nominal_lcoe_cents_per_kwh",
        "year_one_energy_kwh",
        "net_installed_cost",
        "after_tax_equity_irr_year20"
      ]
    },
    {
      "id": "full_biogas_project_finance",
      "title": "Full anaerobic digestion project finance",
      "description": "All mapped scalar assumptions, incentives, reserves and depreciation allocations with finance diagnostics. Detailed year-by-year Complex schedules and formula-derived replacement years use cellOverrides; selectCells and trace expose additional diagnostics.",
      "inputPorts": [
        "system_size_kw",
        "tipping_fee_per_ton",
        "tipping_quantity_tons_year",
        "tipping_fee_source_2",
        "energy_content_per_cubic_foot",
        "quantity_received_each_year",
        "tipping_fee_source_3",
        "electrical_efficiency",
        "quantity_received_each_year_q12",
        "digestate_if_merchantable_for_additional_revenue",
        "availability",
        "digestate_revenue_escalation_factor",
        "parasitic_load",
        "digestate_quantity",
        "waste_heat_heat_capture_efficiency",
        "annual_production_degradation",
        "project_useful_life",
        "waste_heat_selling_price_avoided_cost",
        "waste_heat_selling_price_escalation_factor",
        "capital_cost_detail",
        "installed_cost_per_kw",
        "payment_duration_for_cost_based_tariff",
        "generation_equipment",
        "of_year_one_tariff_rate_escalated",
        "balance_of_plant",
        "cost_based_tariff_escalation_rate",
        "interconnection",
        "development_costs_fee",
        "select_market_value_forecast_methodology",
        "value_of_energy_capacity_recs_yr_1",
        "market_value_escalation_rate",
        "om_cost_detail",
        "select_form_of_federal_incentives",
        "fixed_om_per_kw_year",
        "investment_tax_credit_itc_or_cash_grant",
        "variable_om_cents_per_kwh",
        "itc_or_cash_grant_amount",
        "o_m_cost_inflation_initial_period",
        "itc_utilization_factor_if_applicable",
        "initial_period_ends_last_day_of",
        "o_m_cost_inflation_thereafter",
        "is_pbi_tax_based_ptc_or_cash_based_repi",
        "insurance_yr_1_of_total_cost",
        "pbi_rate",
        "pbi_utilization_or_availability_factor_if_applicable",
        "project_management_yr_1",
        "pbi_duration",
        "feedstock_cost_per_ton",
        "pbi_escalation_rate",
        "feedstock_expense_escalation_factor",
        "additional_federal_grants_other_than_section_1603",
        "feedstock_quantity",
        "federal_grants_treated_as_taxable_income",
        "water_sewer_expenses",
        "water_sewer_expense_escalation_factor",
        "digestate_disposal_if_handled_as_an_expense",
        "select_form_of_state_incentive",
        "digestate_disposal_escalation_factor",
        "itc_amount",
        "digestate_quantity_g49",
        "utilization_factor_if_applicable",
        "property_tax_or_pilot_yr_1",
        "state_itc_realization_period",
        "annual_property_tax_adjustment_factor",
        "land_lease",
        "is_performance_based_incentive_tax_credit_or_cash_pmt",
        "royalties_of_revenue",
        "annual_cap_on_performance_based_incentive",
        "if_cash_is_state_pbi_or_rec_taxable",
        "pbi_or_rec_rate",
        "pbi_utilization_factor_if_applicable",
        "construction_period",
        "pbi_or_rec_paymentduration",
        "interest_rate_annual",
        "pbi_or_rec_escalation_rate_pos_or_neg",
        "additional_state_rebates_grants",
        "total_cap_on_state_rebates_grants",
        "state_grants_treated_as_taxable_income",
        "debt_fraction",
        "debt_term",
        "debt_interest_rate",
        "1st_equipment_replacement",
        "lender_s_fee_of_total_borrowing",
        "1st_replacement_cost_in_year_replaced",
        "required_minimum_annual_dscr",
        "2nd_equipment_replacement",
        "2nd_replacement_cost_in_year_replaced",
        "3rd_equipment_replacement",
        "required_average_dscr",
        "3rd_replacement_cost_in_year_replaced",
        "4th_equipment_replacement",
        "4th_replacement_cost_in_year_replaced",
        "target_after_tax_equity_irr",
        "other_closing_costs",
        "fund_from_operations_or_salvage_value",
        "reserve_requirement",
        "of_months_of_debt_service",
        "of_months_of_o_m_expense",
        "is_owner_a_taxable_entity",
        "federal_income_tax_rate",
        "interest_on_all_reserves",
        "federal_tax_benefits_used_as_generated_or_carried_forward",
        "state_income_tax_rate",
        "state_tax_benefits_used_as_generated_or_carried_forward",
        "bonus_depreciation_enabled",
        "bonus_depreciation_fraction",
        "depreciation_total_installed_cost_5_year_macrs",
        "depreciation_total_installed_cost_7_year_macrs",
        "depreciation_total_installed_cost_15_year_macrs",
        "depreciation_total_installed_cost_20_year_macrs",
        "depreciation_total_installed_cost_5_year_sl",
        "depreciation_total_installed_cost_15_year_sl",
        "depreciation_total_installed_cost_20_year_sl",
        "depreciation_generation_equipment_5_year_macrs",
        "depreciation_generation_equipment_7_year_macrs",
        "depreciation_generation_equipment_15_year_macrs",
        "depreciation_generation_equipment_20_year_macrs",
        "depreciation_generation_equipment_5_year_sl",
        "depreciation_generation_equipment_15_year_sl",
        "depreciation_generation_equipment_20_year_sl",
        "depreciation_balance_of_plant_5_year_macrs",
        "depreciation_balance_of_plant_7_year_macrs",
        "depreciation_balance_of_plant_15_year_macrs",
        "depreciation_balance_of_plant_20_year_macrs",
        "depreciation_balance_of_plant_5_year_sl",
        "depreciation_balance_of_plant_15_year_sl",
        "depreciation_balance_of_plant_20_year_sl",
        "depreciation_interconnection_5_year_macrs",
        "depreciation_interconnection_7_year_macrs",
        "depreciation_interconnection_15_year_macrs",
        "depreciation_interconnection_20_year_macrs",
        "depreciation_interconnection_5_year_sl",
        "depreciation_interconnection_15_year_sl",
        "depreciation_interconnection_20_year_sl",
        "depreciation_development_costs_fee_5_year_macrs",
        "depreciation_development_costs_fee_7_year_macrs",
        "depreciation_development_costs_fee_15_year_macrs",
        "depreciation_development_costs_fee_20_year_macrs",
        "depreciation_development_costs_fee_5_year_sl",
        "depreciation_development_costs_fee_15_year_sl",
        "depreciation_development_costs_fee_20_year_sl",
        "depreciation_reserves_financing_costs_5_year_macrs",
        "depreciation_reserves_financing_costs_7_year_macrs",
        "depreciation_reserves_financing_costs_15_year_macrs",
        "depreciation_reserves_financing_costs_20_year_macrs",
        "depreciation_reserves_financing_costs_5_year_sl",
        "depreciation_reserves_financing_costs_15_year_sl",
        "depreciation_reserves_financing_costs_20_year_sl"
      ],
      "outputPorts": [
        "year_one_coe_cents_per_kwh",
        "nominal_lcoe_cents_per_kwh",
        "year_one_energy_kwh",
        "net_installed_cost",
        "after_tax_equity_irr_year20",
        "minimum_dscr_met",
        "average_dscr_met",
        "year_one_revenue",
        "year_one_operating_expenses",
        "year_one_after_tax_cash_flow",
        "initial_equity_cash_flow",
        "year_one_dscr"
      ]
    }
  ],
  "example": {
    "id": "larger_digester",
    "flow": "quick_biogas_lcoe_check",
    "inputs": {
      "system_size_kw": 1000,
      "availability": 0.94,
      "capital_cost_detail": "Simple",
      "installed_cost_per_kw": 6500,
      "om_cost_detail": "Intermediate",
      "tipping_fee_per_ton": 35,
      "tipping_quantity_tons_year": 15000,
      "debt_fraction": 0.6,
      "debt_interest_rate": 0.06
    },
    "expectedOutputs": {
      "year_one_coe_cents_per_kwh": 8.849999999999998,
      "nominal_lcoe_cents_per_kwh": 8.849999999999993,
      "year_one_energy_kwh": 7410959.999999999,
      "net_installed_cost": 6500000,
      "after_tax_equity_irr_year20": 0.1184021835899466
    },
    "inputsJson": "{\"system_size_kw\":1000,\"availability\":0.94,\"capital_cost_detail\":\"Simple\",\"installed_cost_per_kw\":6500,\"om_cost_detail\":\"Intermediate\",\"tipping_fee_per_ton\":35,\"tipping_quantity_tons_year\":15000,\"debt_fraction\":0.6,\"debt_interest_rate\":0.06}",
    "expectedOutputsJson": "{\"year_one_coe_cents_per_kwh\":8.849999999999998,\"nominal_lcoe_cents_per_kwh\":8.849999999999993,\"year_one_energy_kwh\":7410959.999999999,\"net_installed_cost\":6500000,\"after_tax_equity_irr_year20\":0.1184021835899466}"
  },
  "ports": {
    "text": "https://formualizer.com/catalog/agents/nrel-crest-anaerobic-digestion/v1.4/ports/llms.txt",
    "json": "https://formualizer.com/catalog/agents/nrel-crest-anaerobic-digestion/v1.4/ports/llms.json"
  },
  "service": {
    "openapi": "https://catalog.formualizer.com/v1/models/nrel-crest-anaerobic-digestion/v1.4/openapi.json",
    "types": "https://catalog.formualizer.com/v1/models/nrel-crest-anaerobic-digestion/v1.4/types.d.ts",
    "fio": "https://catalog.formualizer.com/v1/models/nrel-crest-anaerobic-digestion/v1.4/fio.yaml",
    "evaluate": "https://catalog.formualizer.com/v1/models/nrel-crest-anaerobic-digestion/v1.4/evaluate",
    "mcp": "https://catalog.formualizer.com/v1/mcp"
  }
}
